Product Details:
Payment & Shipping Terms:
|
High Light: | continuous casting steel,die casting steel |
---|
R10M Semi-portal Strands Steel Casting Machine 15T per Hour with ISO centrification
radius: R4M,R6M,R8M,R10M
Strand number : 1-8 strands
with ISO certification
advanced design
safe operation
Description:
1. Basic standby technical parameters:
Steel billet casting machine radius |
4m |
Strand quantity |
2 strands |
Ladle support type |
Ladle turret,Ladle car,ladle mounts |
Tundish carriage |
Semi-portal, cross sliding function |
Casting method |
Metering nozzle, open casting |
Secondary cooling |
Water cooling , 1 adjusting circuit |
Withdrawal straightening machine |
Totally 5 roller, progressive straightening |
Roll table |
Chain group centralized drive |
Dummy bar |
Rigid, with self-adapting dummy bar head |
Billet cutting |
Manual cutting |
Billet conveying |
Group centralized live roller table |
Cooling bank type |
Simple cooling bed |
2. Casting speed, productivity and strand quantity
R4m radius casting machine can cast steel groups of different specifications, the maximum casting speed is as follows:
Casting sectional area(mm) |
80×80
|
100×100
|
120×120
|
Casting speed(m/min) |
3.0 |
2.8 |
2.6 |
NO. |
Billet size |
Casting speed |
hourly output (tons) |
Daily output 24hour (tons) |
Annual output(330days) (tons) |
1 |
80×80 |
3.0m/min |
7.42 |
178 |
58,766 |
2 |
100×100 |
2.8m/min |
10.81 |
259. |
85615 |
3 |
120×120 |
2.6m/min |
15.69 |
377 |
124,266 |
The calculation results is the ideal state of the production, please according to own actual situation of adjustment.
Steel grade |
Casting grade(m/min) |
Effective deformation rate(ε) |
Allowable deformation rate(εmax) |
Straight carbon steel |
1.8~2.5 |
Please refer to the computational table |
0.25 |
Low alloy steel |
1.3~2.0 |
Please refer to the computational table |
0.15~0.2 |
3. Technical process description and capacity of steel billet CCM
Induction furnace:
Nominal capacity |
15T |
Tap-to-tap cycle |
60min |
Furnace quantity |
2set |
Production capacity
Working days |
330 days/year |
Average number of daily furnace |
24/day |
Production capacity |
100,000t/year |
Machine Pictures
Factory Pictures
Contact Person: Mr. zhang
Tel: 18810288990
Fax: 86-189-9086-7684