Product Details:
Payment & Shipping Terms:
|
High Light: | Cement Grouting,high strength grout |
---|
High Flow Expanding Non Shrink Cementitious Grout / Non Shrink Grouting
Non-shrinkage grouting material is high strength material as an aggregate (such as: quartz sand, Silicon carbide, etc.),use the cement, grout masterbatch as the medium, made from high flow, micro expansion, segregation and other admixture.
Product features
1. It is precast in factory that could be used by adding water.
2. It is not contain metallic materials which could cause rust.
3. It has high strength and long durability in the early period.
4. It has good artesian function, rapid hardening, less than 1 hours.
5. It is not contain chloride that could avoid the corrosion to the steel and bolt.
6. It can be construction by drying filling, tamping surface, scrape, dump and pumping.
Scope of application
1. It is suitable for flow type grouting materials, precast or pre-casting folder and the grouting of the column.
2. It can be used to fill the holes and defects of concrete and joint cracks between the blocks. As well as concrete joint, cable car track and mechanical support, etc.
3. It is used for the secondary grouting of the installation of steel column and equipment.
4. It can be used for anchor bolts grouting, slab grouting, concrete hollow of concrete precast installation and repair grouting of crack defects.
5. It is suitable for the paste grouting of large stone and tile walls.
6.The toughening type is suitable for installation of large general equipment with strong vibration, basic secondary grouting (large ore crusher, large-scale ball mill, heavy hammer, cold rolling mill, conveyors, power transmission tower, bridge bearings, steam turbine generator sets, large paper machine, crane track and gantry crane rails, etc.)
Treatment of base plane
It should be clean, strong, and free of grease, dust, powder and other loose materials.
Bolts and nuts should be cleaned.
The concrete base materials should be pre-wet but without clear water before construction.
Construction Technology
Construction
Maintains
The exposed parts should be covered by wet cloth or plastic film after the construction to prevent excessive evaporation.
Technical parameters
Test Item |
YY-300 |
YY-310 |
|
Fluidity (mm) |
Initial |
≥300 |
≥270 |
After 30min |
≥270 |
------ |
|
Vertical Expansion |
3h |
0.1-3.5 |
------ |
3h-24h |
0.02-0.5 |
------ |
|
Compressive |
2h |
------ |
≥20 |
1d |
≥25 |
≥38 |
|
3d |
≥42 |
≥51 |
|
28d |
≥62 |
≥62 |
|
Erosion to Iron Bar |
N/A |
N/A |
|
Bleeding Rate (%) |
0 |
0 |
|
Initial Setting Time (min) |
≥45 |
≥20 |
|
Final Setting Time (min) |
≤600 |
≤600 |
Storage period
Keep in cold and dry place, unopened product is valid for 1 year.
Spec.
25kg/bag
FOR OEM:
1. Brand Owner’s Authorization Letter is required to be issued & provided for the corresponding production and exportation;
2. Quality only based on the samples which the buyer provided or YUNYAN’s counter-sample confirmed by buyer.
In every case, the user alone is fully responsible for any consequences deriving from the use of the product.
3. OEM MOQ: at least 1*20 feet container per item/color.
4. Printery mold fee: USD250 for 3000 bags at least.
Package cost: USD0.40/bag
Printing lead time: 12-15days
Contact Person: Mr. zhang
Tel: 18810288990
Fax: 86-189-9086-7684